Create Your First Project
Start adding your projects to your portfolio. Click on "Manage Projects" to get started
DPR for 35 MW Floating Solar Power Plant
Project type
Feasibility Study of Large-scale Floating Solar Power Plant
Date
October 2023
Location
Umrong Reservoir, Assam
Highlights:
• Developed a comprehensive feasibility study covering site survey, environmental & social impacts, and technical design.
• Detailed evaluation of plant design, energy yield estimation, grid integration, and evacuation system.
• Financial analysis including cost per MW, debt-equity structuring, IRR, payback period, and tariff competitiveness.
• Recommendations aligned with India’s renewable energy goals and NEEPCO’s clean energy mission.
• Key Outcomes
• Capacity: 35.2 MW (AC) / 42.26 MWp (DC)
• Modules & Inverters: ~77,544 mono-crystalline panels (545 Wp each) with 8 inverters of 4.4 MWp capacity
• Annual Energy Generation: ~60.14 Million Units (MU) at P75 confidence level
• Plant Load Factor (PLF): ~16.25%
• Project Cost: ₹200.39 Crores (~₹4.74 Crore/MWp)
• Tariff Considered: ₹4.30 per unit (bankable)
• Payback Period: ~12 years
• Socio-Environmental Benefits: Water conservation through reduced evaporation, enhanced panel efficiency due to cooling effect, reduced carbon footprint, and job creation in the region

